Projects

ChemCo Model C Paste Pump Used to Install Thousands of Dowels at Water Treatment Plant

Problem: Efficiently Install Thousands of Dowels

Solution: 8000 Dowels Installed with Automated Mix Pump (Model C)

  • 4-5 Times Faster than Cartridges
  • Minimal Waste
  • Fast Set Paste
  • Zero Failures on all Proof Tests (2 Days After Installation)
  • Low Bulk Costs in 5-Gallon Pails
  • Less Operator Fatigue
  • Assured Ratio

Tell us about your project

CALL 650-261-3790.