Projects

ChemCo Large Void Grout Used in Seismic Upgrade at Scott Library

Problem: Upgrade Stone Wall Strength with Epoxy Grout and Steel

Solution: 3 Sand Gap-Graded Mix with Grout, Large Void to Make Structural Grout Columns

  • Bulk Caulk Guns Placed Filled Epoxy Aggregate Mix in Space-Restricted Areas
  • Leaks Sealed with Urethane Foam and Plywood
  • New Vertical Rebar Sealed by Epoxy

Tell us about your project

CALL 650-261-3790.